Home

New Page Title | About Myself | Quotations | Kerala | Interesting Articles | Books I liked | Quality | Contact Me | Photo Album
Abyss
Quality

indianflag.jpg

Click here for my professional works

Being Better Is Cheaper

Click to receive email
when this page is updated
Powered by NetMind

Six sigma tells us;

- we dont know what we dont know

- we cant do what we dont know

- we dont know until we measure

- we dont measure, what we dont value

- we dont value what we dont measure

by Charles Fishman

The right stuff kicks in at T-minus 31 seconds.

As the 120-ton space shuttle sits surrounded by almost 4 million
pounds of rocket fuel, exhaling noxious fumes, visibly impatient to
defy gravity, its on-board computers take command. Four identical
machines, running identical software, pull information from
thousands of sensors, make hundreds of milli-second decisions, vote
on every decision, check with each other 250 times a second. A fifth
computer, with different software, stands by to take control should
the other four malfunction.

At T-minus 6.6 seconds, if the pressures, pumps, and temperatures
are nominal, the computers give the order to light the shuttle main
engines -- each of the three engines firing off precisely 160
milliseconds apart, tons of super-cooled liquid fuel pouring into
combustion chambers, the ship rocking on its launch pad, held to the
ground only by bolts. As the main engines come to one million pounds
of thrust, their exhausts tighten into blue diamonds of flame.

Then and only then at T-minus zero seconds, if the computers are
satisfied that the engines are running true, they give the order to
light the solid rocket boosters. In less than one second, they
achieve 6.6 million pounds of thrust. And at that exact same moment,
the computers give the order for the explosive bolts to blow, and
4.5 million pounds of spacecraft lifts majestically off its launch
pad.

It's an awesome display of hardware prowess. But no human pushes a
button to make it happen, no astronaut jockeys a joy stick to settle
the shuttle into orbit.

The right stuff is the software. The software gives the orders to
gimbal the main engines, executing the dramatic belly roll the
shuttle does soon after it clears the tower. The software throttles
the engines to make sure the craft doesn't accelerate too fast. It
keeps track of where the shuttle is, orders the solid rocket
boosters to fall away, makes minor course corrections, and after
about 10 minutes, directs the shuttle into orbit more than 100 miles
up. When the software is satisfied with the shuttle's position in
space, it orders the main engines to shut down -- weightlessness
begins and everything starts to float.

But how much work the software does is not what makes it remarkable.
What makes it remarkable is how well the software works. This
software never crashes. It never needs to be re-booted. This
software is bug-free. It is perfect, as perfect as human beings have
achieved. Consider these stats : the last three versions of the
program -- each 420,000 lines long-had just one error each. The last
11 versions of this software had a total of 17 errors. Commercial
programs of equivalent complexity would have 5,000 errors.

This software is the work of 260 women and men based in an anonymous
office building across the street from the Johnson Space Center in
Clear Lake, Texas, southeast of Houston. They work for the "on-board
shuttle group," a branch of Lockheed Martin Corps space mission
systems division, and their prowess is world renowned: the shuttle
software group is one of just four outfits in the world to win the
coveted Level 5 ranking of the federal governments Software
Engineering Institute ( SEI ) a measure of the sophistication and
reliability of the way they do their work. In fact, the SEI based it
standards in part from watching the on-board shuttle group do its
work.

The group writes software this good because that's how good it has
to be. Every time it fires up the shuttle, their software is
controlling a $4 billion piece of equipment, the lives of a
half-dozen astronauts, and the dreams of the nation. Even the
smallest error in space can have enormous consequences: the orbiting
space shuttle travels at 17,500 miles per hour; a bug that causes a
timing problem of just two-thirds of a second puts the space shuttle
three miles off course.

NASA knows how good the software has to be. Before every flight, Ted
Keller, the senior technical manager of the on-board shuttle group,
flies to Florida where he signs a document certifying that the
software will not endanger the shuttle. If Keller can't go, a formal
line of succession dictates who can sign in his place.

Bill Pate, who's worked on the space flight software over the last
22 years, says the group understands the stakes: "If the software
isn't perfect, some of the people we go to meetings with might die.

Software is everything. ( It also sucks. )

In the history of human technology, nothing has become as essential
as fast as software.

Virtually everything -- from the international monetary system and
major power plants to blenders and microwave ovens -- runs on
software. In office buildings, the elevators, the lights, the water,
the air conditioning are all controlled by software. In cars, the
transmission, the ignition timing, the air bag, even the door locks
are controlled by software. In most cities so are the traffic
lights. Almost every written communication that's more complicated
than a postcard depends on software; every phone conversation and
every overnight package delivery requires it.

Software is everything. It also sucks.

"It's like pre-Sumerian civilization," says Brad Cox, who wrote the
software for Steve Jobs NeXT computer and is a professor at George
Mason University. "The way we build software is in the
hunter-gatherer stage."

John Munson, a software engineer and professor of computer science
at the University of Idaho, is not quite so generous. "Cave art," he
says. "It's primitive. We supposedly teach computer science. There's
no science here at all."

Software may power the post-industrial world, but the creation of
software remains a pre-industrial trade. According to SEI's studies,
nearly 70% of software organizations are stuck in the first two
levels of SEI's scale of sophistication: chaos, and slightly better
than chaos. The situation is so severe, a few software pioneers from
companies such as Microsoft have broken away to teach the art of
software creation ( see "Drop and Code me Twenty!" )

Mark Paulk, a senior member of the SEI technical, says the success
of software makes its weaknesses all the more dramatic. "We've
developed software products that are enormously complex and
enormously powerful. We're critically dependent on it," says Paulk.
"Yet everyone complains how bad software is, with all the defects.
If you bought a car with 5,000 defects, you'd be very upset."

In this software morass, the on-board shuttle group stands out as an
exception. Ten years ago the shuttle group was considered
world-class. Since then, it has cut its own error rate by 90%.

To be this good, the on-board shuttle group has to be very different
-- the antithesis of the up-all-night, pizza-and-roller-hockey
software coders who have captured the public imagination. To be this
good, the on-board shuttle group has to be very ordinary --
indistinguishable from any focused, disciplined, and methodically
managed creative enterprise.

In fact, the group offers a set of textbook lessons that applies
equally to programmers, in particular, and producers, in general. A
look at the culture they have built and the process they have
perfected shows what software-writing must become if software is to
realize its promise, and illustrates what almost any team-based
operation can do to boost its performance to achieve near-perfect
results.

Software for Grown-Ups

"Shipping hell continued today. Grind, grind, grind. We'll never
make it. Have I said that already? Why do we always underestimate
our shipping schedules? I just don't understand. In at 9:30 AM; out
at 11:30 PM Dominos for dinner. And three diet Cokes."

No, it's not the on-board shuttle group. It's Douglas Coupland's
"Microserf's," a true-to-life fictional account of life in the
software-fast-lane. And it's the dominant image of the software
development world: Gen-Xers sporting T-shirts and distracted looks,
squeezing too much heroic code writing into too little time;
rollerblades and mountain bikes tucked in corners; pizza boxes and
Starbucks cups discarded in conference rooms; dueling tunes from
Smashing Pumpkins, Alanis Morrisette and the Fugees. Its the world
made famous, romantic, even inevitable by stories out of Sun
Microsystems, Microsoft, and Netscape.

It's not the story of the on-board shuttle group. Their quarters are
a study in white-collar pedestrian. The most striking thing is how
ordinary they look. Other than the occasional bit of shuttle
memorabilia, you could be in the offices of any small company or
government agency. Everyone has his or her own small office, and the
offices have desks, PCs, and sparse personal artifacts. People wear
moderately dressy clothes to work, neat but nothing flashy,
certainly nothing grungy.

It's strictly an 8-to-5 kind of place -- there are late nights, but
they're the exception. The programmers are intense, but low-key.
Many of them have put in years of work either for IBM ( which owned
the shuttle group until 1994 ), or directly on the shuttle software.
They're adults, with spouses and kids and lives beyond their
remarkable software program.

That's the culture: the on-board shuttle group produces grown-up
software, and the way they do it is by being grown-ups. It may not
be sexy, it may not be a coding ego-trip -- but it is the future of
software. When you're ready to take the next step -- when you have
to write perfect software instead of software that's just good
enough -- then it's time to grow up.

Ted Keller, 48, the group's senior technical manager, looks and
sounds like the headmaster of a small private high school. It's
Keller's job to make sure the software gets delivered on time, with
all its capabilities, without regard to turf battles. He's a
compact, bald man, a little officious and persnickety, qualities any
astronaut would find reassuring. He has a gentle, geeky sense of
humor, not so much with outsiders, but with his crowd.

It comes out in a meeting between members of the software group and
their NASA counterparts. It's held in a small conference room
overstuffed with 22 people and an overhead projector. Several times,
from the back of the room, Keller issues a wry remark about the
speed of code delivery, or the detail of some specifications, and
the room lightens with laughter.

Otherwise, the hour-long meeting is sober and revealing, a brief
window on the culture. For one thing, 12 of the 22 people in the
room are women, many of them senior managers or senior technical
staff. The on-board shuttle group, with its stability and
professionalism, seems particularly appealing to women programmers.

For another, it's an exercise in order, detail, and methodical
reiteration. The meeting is a classic NASA performance -- a
rehearsal for an almost identical meeting several weeks away. It
consists of walking through an enormous packet of data and view --
graphs which describe the progress and status of the software line
by line. Except for Keller's occasional asides, the tone is
businesslike, almost formal, the view - graphs flashing past as
quickly as they can be read, a blur of acronyms, graphs, and
charts.

What's going on here is the kind of nuts-and-bolts work that defines
the drive for group perfection -- a drive that is aggressively
intolerant of ego-driven hotshots. In the shuttle group's culture,
there are no superstar programmers. The whole approach to developing
software is intentionally designed not to rely on any particular
person.

And the culture is equally intolerant of creativity, the individual
coding flourishes and styles that are the signature of the all-night
software world. "People ask, doesn't this process stifle
creativity? You have to do exactly what the manual says, and you've
got someone looking over your shoulder," says Keller. "The answer
is, yes, the process does stifle creativity."

And that is precisely the point -- you can't have people freelancing
their way through software code that flies a spaceship, and then,
with peoples lives depending on it, try to patch it once its in
orbit. "Houston, we have a problem," may make for a good movie; it's
no way to write software. "People have to channel their creativity
into changing the process," says Keller, "not changing the
software."

The tight strictures the group practices can make the siren song of
the rock n roll software world hard to resist. Quinn Larson, 34, had
worked on shuttle software for seven years when he left last January
to go to work for Micron Technology in Boise, Idaho, automating the
manufacture of Microns memory chips.

At Micron, Larson was given the task to automate the saws that cut
finished chip wafers to the right size. Screw up the program, you
destroy the valuable wafers.

"It was up to me to decide what to do," says Larson. "There were no
meetings, there was no record-keeping." He had freedom; it was a
real kick. But to Larson's way of thinking, the culture didn't focus
on, well, the right stuff. "Speed there was the biggest thing," he
says. "The engineers would say, these are our top priorities, and we
need to get'em as fast as we can." But the impression Larson got was
that engineers didn't seem too concerned about how well the finished
software actually worked. "Basically, they wanted quick software --
just put it out the door."

Larson started back at the shuttle group in mid-August. "The people
here are just of the highest caliber," he said on his first day back
in Clear Lake.

It's the Process

How do they write the right stuff?

The answer is, it's the process. The group's most important creation
is not the perfect software they write -- it's the process they
invented that writes the perfect software.

It's the process that allows them to live normal lives, to set
deadlines they actually meet, to stay on budget, to deliver software
that does exactly what it promises. It's the process that defines
what these coders in the flat plains of southeast suburban Houston
know that everyone else in the software world is still groping for.
It's the process that offers a template for any creative enterprise
that's looking for a method to produce consistent - and consistently
improving -- quality.

The process can be reduced to four simple propositions:

1. The product is only as good as the plan for the product.

At the on-board shuttle group, about one-third of the process of
writing software happens before anyone writes a line of code. NASA
and the Lockheed Martin group agree in the most minute detail about
everything the new code is supposed to do -- and they commit that
understanding to paper, with the kind of specificity and precision
usually found in blueprints. Nothing in the specs is changed without
agreement and understanding from both sides. And no coder changes a
single line of code without specs carefully outlining the change.
Take the upgrade of the software to permit the shuttle to navigate
with Global Positioning Satellites, a change that involves just 1.5%
of the program, or 6,366 lines of code. The specs for that one
change run 2,500 pages, a volume thicker than a phone book. The
specs for the current program fill 30 volumes and run 40,000 pages.

"Our requirements are almost pseudo-code," says William R. Pruett,
who manages the software project for NASA. "They say, you must do
exactly this, do it exactly this way, given this condition and this
circumstance."

This careful design process alone is enough to put the shuttle
organization in a class by itself, says John Munson of the
University of Idaho. Most organizations launch into even big
projects without planning what the software must do in
blueprint-like detail. So after coders have already started writing
a program, the customer is busily changing its design. The result is
chaotic, costly programming where code is constantly being changed
and infected with errors, even as it is being designed.

"Most people choose to spend their money at the wrong end of the
process," says Munson. "In the modern software environment, 80% of
the cost of the software is spent after the software is written the
first time -- they don't get it right the first time, so they spend
time flogging it. In shuttle, they do it right the first time. And
they don't change the software without changing the blueprint.
That's why their software is so perfect."

2. The best teamwork is a healthy rivalry.

Within the software group, there are subgroups and subcultures. But
what could be divisive office politics in other organizations is
actually a critical part of the process.

The central group breaks down into two key teams: the coders - the
people who sit and write code -- and the verifiers -- the people who
try to find flaws in the code. The two outfits report to separate
bosses and function under opposing marching orders. The development
group is supposed to deliver completely error-free code, so perfect
that the testers find no flaws at all. The testing group is supposed
to pummel away at the code with flight scenarios and simulations
that reveal as many flaws as possible. The result is what Tom
Peterson calls "a friendly adversarial relationship."

"They're in competition for who's going to find the errors," says
Keller. "Sometimes they fight like cats and dogs. The developers
want to catch all their own errors. The verifiers get mad, 'Hey,
give it up! You're taking away from our time to test the software!'"

The developers have even begun their own formal inspections of the
code in carefully moderated sessions, a rigorous proof-reading they
hope will confound the testers. The verifiers, in turn, argue that
they deserve credit for some errors found before they even start
testing. "From the verification group's perspective," says Pat
McLellan, a senior manager, "we're aware that if there was no
independent verification group, the developers would tend to be more
lax. Just the presence of our group makes them more careful."

The results of this friendly rivalry: the shuttle group now finds
85% of its errors before formal testing begins, and 99.9% before the
program is delivered to NASA.

3. The database is the software base.

There is the software. And then there are the databases beneath the
software, two enormous databases, encyclopedic in their
comprehensiveness.

One is the history of the code itself -- with every line annotated,
showing every time it was changed, why it was changed, when it was
changed, what the purpose of the change was, what specifications
documents detail the change. Everything that happens to the program
is recorded in its master history. The genealogy of every line of
code -- the reason it is the way it is -- is instantly available to
everyone.

The other database -- the error database -- stands as a kind of
monument to the way the on-board shuttle group goes about its work.
Here is recorded every single error ever made while writing or
working on the software, going back almost 20 years. For every one
of those errors, the database records when the error was discovered;
what set of commands revealed the error; who discovered it; what
activity was going on when it was discovered -- testing, training,
or flight. It tracks how the error was introduced into the program;
how the error managed to slip past the filters set up at every stage
to catch errors -- why wasn't it caught during design? during
development inspections? during verification? Finally, the database
records how the error was corrected, and whether similar errors
might have slipped through the same holes.

The group has so much data accumulated about how it does its work
that it has written software programs that model the code-writing
process. Like computer models predicting the weather, the coding
models predict how many errors the group should make in writing each
new version of the software. True to form, if the coders and testers
find too few errors, everyone works the process until reality and
the predictions match.

"We never let anything go," says Patti Thornton, a senior manager.
"We do just the opposite: we let everything bother us."

4. Don't just fix the mistakes -- fix whatever permitted the mistake
in the first place.

The process is so pervasive, it gets the blame for any error -- if
there is a flaw in the software, there must be something wrong with
the way its being written, something that can be corrected. Any
error not found at the planning stage has slipped through at least
some checks. Why? Is there something wrong with the inspection
process? Does a question need to be added to a checklist?

Importantly, the group avoids blaming people for errors. The process
assumes blame - and it's the process that is analyzed to discover
why and how an error got through. At the same time, accountability
is a team concept: no one person is ever solely responsible for
writing or inspecting code. "You don't get punished for making
errors," says Marjorie Seiter, a senior member of the technical
staff. "If I make a mistake, and others reviewed my work, then I'm
not alone. I'm not being blamed for this."

Ted Keller offers an example of the payoff of the approach,
involving the shuttles remote manipulator arm. "We delivered
software for crew training," says Keller, "that allows the
astronauts to manipulate the arm, and handle the payload. When the
arm got to a certain point, it simply stopped moving."

The software was confused because of a programming error. As the
wrist of the remote arm approached a complete 360-degree rotation,
flawed calculations caused the software to think the arm had gone
past a complete rotation -- which the software knew was incorrect.
The problem had to do with rounding off the answer to an ordinary
math problem, but it revealed a cascade of other problems.

"Even though this was not critical," says Keller, "we went back and
asked what other lines of code might have exactly the same kind of
problem." They found eight such situations in the code, and in seven
of them, the rounding off function was not a problem. "One of them
involved the high-gain antenna pointing routine," says Keller.
"That's the main antenna. If it had developed this problem, it could
have interrupted communications with the ground at a critical time.
That's a lot more serious."

The way the process works, it not only finds errors in the software.
The process finds errors in the process.

Just a Software Problem

The B-2 bomber wouldn't fly on its maiden flight -- but it was just
a software problem. The new Denver airport was months late opening
and millions of dollars over budget because its baggage handling
system didn't work right -- but it was just a software problem. This
spring, the European Space Agency's new Ariane 5 rocket blew up on
its maiden launch because of a little software problem. The federal
government's major agencies - from the IRS to the National Weather
Service -- are beset with projects that are years late and hundreds
of millions of dollars over budget, often because of simple software
problems. Software is getting more and more common and more and more
important, but it doesn't seem to be getting more and more
reliable.

As the rest of the world struggles with the basics, the on-board
shuttle group edges ever closer to perfect software. Admittedly they
have a lot of advantages over the rest of the software world. They
have a single product: one program that flies one spaceship. They
understand their software intimately, and they get more familiar
with it all the time. The group has one customer, a smart one. And
money is not the critical constraint: the groups $35 million per
year budget is a trivial slice of the NASA pie, but on a
dollars-per-line basis, it makes the group among the nation's most
expensive software organizations.

And that's the point: the shuttle process is so extreme, the drive
for perfection is so focused, that it reveals what's required to
achieve relentless execution. The most important things the shuttle
group does -- carefully planning the software in advance, writing no
code until the design is complete, making no changes without
supporting blueprints, keeping a completely accurate record of the
code -- are not expensive. The process isn't even rocket science.
Its standard practice in almost every engineering discipline except
software engineering.

Plastered on a conference room wall, an informal slogan of the
on-board shuttle group captures the essence of keeping focused on
the process: "The sooner you fall behind, the more time you will
have to catch up."


______________________________________________________________________

Many companies and managers take refuge in one or more of the following beliefs:

To err is human.
Excessive quality costs too much, takes too long.
Just meeting last year's nubers is good enough.
Soft errors (like paperwork) are more excusable.
We are still better than our competitors.
Firefighting our way out of a quality emergency in the nick of time is a badge of honor; it was even fun.